Featured Project:  PLC Pump controller modernization

Location: Ventura, CA

Description: Migrated an existing SLC controller with 4 DeviceNet network controlling ~ 60 devices on a critical system. System migrated to ControlLogix with remote I/O racks and VFD’s moving over to Ethernet. Existing Powermonitors and overload protection devices stayed on DeviceNet. Main system was run in hand for 4 hours while switch over was made. Fine tuning of HMI application and clean up was 3 days.